Step 1 to insert the base into the fixed lever and rotate with the fixed handle;
Step 2. Relax tension rod seat is fixed on the fixing screw, the tension rod into the pivot shaft, then screw alignment rotating shaft side of the installation plane and screwing tool; at the end of the tension rod and axis of rotation at the exit of the flush.
Step 3. According to the tension control of wire diameter range and tension range select suitable tension spring, large spring control a greater tension wire / coarse wire, the selected good spring to the end of the hanging on the spring fixed block hole, the other end hanging in tension spring tension rod hanging hole.
Step 4 of the CN1 connector is connected with the power input cable, CN2 connector is connected with the signal input cable shielding.